- PUD-APPROVED SITE WITH $550K IN COMPLETED PAD IMPROVEMENTS
- PUD approved site with $550K of site improvements – Site has been approved for a site down restaurant under a PUD. Sellers have invested in excess of $550,000 in site improvements so that site is vertical construction ready following approval of construction documents. Improvements include civil engineering, stream relocation, soil replacement and balancing, stubbed utilities, storm water retention system, private road, curb cuts, etc.
- 1.3 USABLE ACRES
- Site is 3.9 Acres total, with 1.3 usable acres after relocating the drain (work has been performed, as seen on page 4 (proposed site plan)).
- HIGH TRAFFIC LOCATION
- Located on one of the last remaining corners in Orion Township, at Waldon and M-24 (Lapeer Road), with traffic counts over 45,000 VPD daily.